Zhejiang ShuiXin Group Co., Ltd.   www.300.cn  浙ICP备17056602号 

INTO SHUIXIN

TEL:0086-571-81607532
FAX:0086-571-86836976
E-MAIL:office@zjsxholding.cn

Room2005, Building A, Universal Center, No. 626 Kejiguan Street, Binjiang District, Hangzhou, China

0571

Group industry

Support hotline

Information classification

81607532

Download Center

  • 让水利更有价值,让资本更有作为
  • 价值投资

集团产业

Xiaoxi beach water conservancy hub

Entry name

Xiaoxi beach water conservancy hub

Zhejiang Longyou Creek Beach water conservancy project, Zhejiang Xin water holding group accounted for 52% of the shares
Project classification
没有此类产品
Project description
   The Xiaoxi beach water control project in Longyou is an important project for the group companies to  take advantage of their own enterprises and participate in industrial investment.
  Xiaoxitan hydropower project is located in the territory of Qiantang River in the middle reaches of Longyou, Qujiang and the Lingshan    river about 6.5 km downstream of the confluence of the Qujiang, is a " comprehensive plan" and "Qiantang River Qiantang River basin in the middle reaches of Sanjiang cascade development  planning" in the recommended development phase of the construction project, the dam site above the catchment  area of 10462 square kilometers. The average annual runoff of 11 billion 680 million cubic meters. The  project is based on power generation, improving water environment and irrigation conditions, and taking into  account  the comprehensive development and utilization of shipping.
  The project started construction in January 2004, the normal storage capacity of the reservoir is 40 meters, and the normal storage capacity is 15 million 740 thousand cubic meters. The power station installed 4500kW x 4 units, the general assembly machine 18MW, the first unit was put into production in September 2006,  and the annual power generation hours were 4154 hours.
  The hydraulic structures are III and other projects. The main buildings are grade 3. The standard of the  design and verification of the flood water level is 50 and 100 years.
  After completion of the project, annual average generating capacity reached 74 million 780 thousand kwh, while water and irrigation conditions improved, taking into account the comprehensive development and utilization of shipping, the economic and social benefits are very impressive, but also has very important significance to promote economic and social development in Longyou county.
  In the power plant, production is managed with the safety first and prevention principle of safety production and operation. In April 2015, the Water Conservancy Bureau of Zhejiang province was awarded the two level unit for the standardization of the safety production of the rural hydropower station. 

 

 

 

 

Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
Key words
Previous article
Next article